|
CABINETS
Will the cabinets stand up to the garage environment
A: The powder coat on RedLine cabinets are designed to withstand
extremes in temperature and humidity.
Are RedLine cabinets difficult to clean?
A: No, simply wipe with a damp cloth and they will come clean and
will not show streaks.
How long does the standard installation take?
A: Generally if the area is cleaned of all impediments the cabinets
can be installed in less than (2) days.
Where are the cabinets made?
A: All the cabinets are made in the USA by the Greenberg Casework
Company in South Beloit, Illinois.
What does the Lifetime Warranty cover?
A: When installed by an authorized RedLine agent, the cabinets are
guaranteed to function normally for a lifetime. Minor scratches,
dents, nicks, and scuffs are normal wear and are not covered.
FLOORS
How long before the floor coating will wear out?
A: Generally 15-20 years with normal foot traffic.
Does the floor get slippery?
A: Yes when water or oil is present. Aluminum oxide non-skid is
recommended to combat this condition.
What are the flake chips for?
A: They help with nonslip and help hide imperfections in the floor
by adding a decorative look.
Do the flake chips wear out?
A: No more than the coating generally.
Should we put aluminum oxide nonskid in the floor in addition to
the chips?
A: If the conditions present water or oil, we recommend it.
Does the nonskid wear out?
A: Yes in approximately 5 years .
Does crack and mortar joint patching crack or peel?
A: All concrete moves. Mortar joints and saw cuts are engineered
to allow for the movement of concrete. Cracks are the cause of more
movement than the mortar joints\saw cuts will allow for. Due to
this cracks\mortar joints\saw cuts can be patched but there is no
guarantee that they will not move in the future, therefore causing
a crack in the epoxy patch. Generally this will simply be a small
crack that will not chip or peel from the concrete.
Does everything need to be out of the garage before we have Gorilla
Garage Gear install the coating?
A: Yes in all areas you wish to have coating applied. We can cut
in around equipment if that is your preference.
How long does the standard coating take to apply, including preparation?
A: Generally, 3 days in most cases.
How long does it take to dry?
A: 48 hours foot traffic, 4 days for movement and car traffic at
65 degrees F or higher. (longer at cooler temperatures)
NOTE: THE QUESTIONS ABOVE APPLY TO THE STANDARD EPOXY FLAKE SYSTEM,
USUALLY APPLIED TO INDUSTRIAL FLOORS, RESIDENTIAL GARAGES OR BASEMENTS.
|